Update Terakhir : 27 Jul 2016
Panjang Jalan Menurut Jenis Permukaan dan Kondisi Jalan di Kota Tanjungbalai (km), 2011 - 2015/Road Length by Type of Surface and Condition in Tanjungbalai (km), 2011 - 2015 |
|
|
|
|
|
|
Jenis Permukaan/Type of Surface dan Kondisi Jalan/Road Condition |
2011 |
2012 |
2013 |
2014 |
2015 |
Jenis Permukaan |
308.82 |
326.27 |
335.5 |
346.12 |
348.57 |
1. Diaspal/Ashalted |
65.45 |
72.34 |
73.53 |
77.6 |
78.99 |
2. Hotmix/Hotmix |
92.89 |
96.38 |
100.51 |
100.51 |
103.72 |
3. Batu /Stone |
29.56 |
22.67 |
20.87 |
17.15 |
13.77 |
4. Beton/Concrete |
56.98 |
69.99 |
73.9 |
79.09 |
80.94 |
5. Kerikil/Gravel |
39.48 |
46.62 |
50.83 |
55.76 |
57.3 |
6. Tanah/Earth |
24.46 |
18.27 |
15.86 |
16.01 |
13.86 |
Kondisi |
308.82 |
326.27 |
335.5 |
346.12 |
348.57 |
1. Baik/Good |
190.26 |
209.15 |
215.61 |
229.94 |
242.29 |
2. Sedang/Fair |
73.28 |
90.73 |
82.85 |
73.04 |
66.86 |
3. Rusak/Poor |
39.39 |
20.5 |
23.55 |
27.51 |
21.35 |
4. Rusak Berat/Very Poor |
5.89 |
5.89 |
13.5 |
15.61 |
18.07 |
Sumber : Dinas Pekerjaan Umum Kota Tanjungbalai/ Public Work Service of Tanjungbalai |
|